Reconnections under One Roof

Berkeley, CA

The rear of this home had been remodeled previously and did not suit our client. Additionally, the exterior walls were located too close to the property line.

  • We demolished parts of the back half of the home while keeping the roof structure in place, in essence replacing everything under the roof while bringing in the exterior walls.
  • Levitch completed a new Kitchen/Family Room, Eating Nook, and Laundry Room on the main floor. The second story holds a newly remodeled Bedroom with vaulted ceilings and a skylit Master Bathroom.

 

Photography by Alan Geller